Pictures taken week commencing 8th March

 

 

While this is not the best quality picture ever taken it clearly shows that the pull in area is almost complete with the curb being dropped and the whole area being tarmaced.

The new white electricity meter box is also clearly visible just before the first window on the side of the church.

 

 

The gas main is being re-routed to the boiler room. The old notice board can just be seen leaning up against the side wall.

 

 

Some of the interior wiring exposed. The inner porch door is visible to the left.

 

 

Apologies for the quality of this picture.

The new electricity consumer unit can be seen on the extreme left and just to the left of the inner porch doors the new thick white main power cable can just be made out.