Building work has now
commenced at the front of the church
These
pictures were taken on
|
|
This picture shows the front of the church with the
porch which is due to be demolished along with the fence at the front. The
kerb is to be dropped and the ground levelled to allow cars to pull in off of
the road to drop off and pick up |
|
|
|
|
The notice board soon to be replaced and some preliminary earth works |
The general services, particularly gas and electricity have to be re-routed as meters for both are situated in the current porch |
|
|
The existing porch, soon to be demolished |
|
|
The small curved wall marking the edge of the drive running along the side of the church has already been removed |