Building work has now commenced at the front of the church

These pictures were taken on Sunday 22/2/04

 

This picture shows the front of the church with the porch which is due to be demolished along with the fence at the front. The kerb is to be dropped and the ground levelled to allow cars to pull in off of the road to drop off and pick up

 

 

The notice board soon to be replaced and some preliminary earth works

The general services, particularly gas and electricity have to be re-routed as meters for both are situated in the current porch

 

The existing porch, soon to be demolished

 

The small curved wall marking the edge of the drive running along the side of the church has already been removed